Controlled Tension
Actuation and structure matched to the required clothing load and travel.
JIACHENGPAPER MACHINE ENGINEERINGRequest a quote
PRODUCT SYSTEM · 09
FABRIC HANDLING SYSTEMS
Jiacheng tensioners and guiding systems are configured around machine width, travel, loading method, mounting arrangement and the clothing position. Assemblies are manufactured and function-tested before delivery.
Actuation and structure matched to the required clothing load and travel.
Responsive correction assemblies for stable fabric or felt tracking.
Mounting interfaces adapted to new equipment and rebuild projects.
OPERATING BENEFITS
Actuation and travel are configured around forming-fabric or felt load requirements.
Correction assemblies support reliable fabric and felt tracking during operation.
Frames, bearings, actuators and mounting interfaces are adapted to the machine layout.
Movement, correction response and adjustment can be checked before delivery.


APPLICATIONS
TECHNICAL PROFILE
Final materials, dimensions and interfaces are confirmed from the customer’s operating data and drawings.
IN-HOUSE CAPABILITY
Project requirements are translated into practical manufacturing, inspection and support steps by one coordinated team.
FREQUENTLY ASKED QUESTIONS
Please provide the clothing position, working width, roll dimensions, required travel, target tension and installation drawing.
Please send the fabric or felt position, guide-roll dimensions, correction travel, actuator preference and available mounting space.
Yes. Existing-machine drawings, site dimensions and operating issues are reviewed before the replacement interface is finalized.
TECHNICAL INQUIRY
These details help our engineers understand your operating target and prepare a relevant technical proposal.
PROJECT BRIEF
Submit the basic process data below. Jiacheng will use it to prepare the next technical discussion—not a generic catalogue quotation.
DISCUSS YOUR PROJECT
Send your parameters, existing drawings or site photos. Our team will review the application and reply with the next engineering steps.